Quantcast
Viewing all articles
Browse latest Browse all 21471

Electric Boat Wins USS Minnesota PSA Contract Modification

Image may be NSFW.
Clik here to view.
USS MINNESOTA
USS MINNESOTA

General Dynamics Electric Boat Corp (GDEB) has received a USD 57.1 mln contract modification for the planning and execution of the USS Minnesota’s (SSN 783) post shakedown availability (PSA).


Electric Boat will also procure long lead time material in preparation to accomplish the maintenance, repair, alterations, testing, and other work on the USS Minnesota during its scheduled PSA.
USS Minnesota (SSN-783) is the 10th of a projected 30 Virginia-class submarines. The attack submarine is the last of the block II Virginia-class submarines and as commissioned during a ceremony at Naval Station Norfolk in Norfolk, Va., on September 7, 2013.
Construction began in February 2008, and the keel was authenticated in May 2011. The boat was christened Oct. 27, 2012.
Work will be performed in Groton, Conn. (99 percent) and Quonset Point, R.I. (1 percent), and is expected to be completed by February 2015.

Naval Today Staff, March 11, 2014; Image: US Navy
Visit Website
Image may be NSFW.
Clik here to view.
Facebook
Image may be NSFW.
Clik here to view.
Share on Google Plus
Image may be NSFW.
Clik here to view.
Twitter
Image may be NSFW.
Clik here to view.
Hootsuite
Image may be NSFW.
Clik here to view.
LinkedIn
Image may be NSFW.
Clik here to view.
Hootsuite
Image may be NSFW.
Clik here to view.
Buffer
Image may be NSFW.
Clik here to view.
Custom Sharing Tool
Image may be NSFW.
Clik here to view.
Image may be NSFW.
Clik here to view.
Evernote
Image may be NSFW.
Clik here to view.
Image may be NSFW.
Clik here to view.
Image may be NSFW.
Clik here to view.
 
+TAG

Viewing all articles
Browse latest Browse all 21471

Trending Articles